Posted on: March 1, 2020 Posted by: admin Comments: 0

ASTM D4945-00 PDF

Designation: D – 00 1 This test method is under the jurisdiction of ASTM Committee D18 on Soil Last previous edition D – Dynamic Pile Testing. ASTM D Pile Driving Analyzer ®. Garland Likins, Pile Dynamics, Inc. PDCA Professor’s Institute. Garland Likins, Pile Dynamics. standard by ASTM International, 11/01/ View all product details ASTM D/DM Priced From $ ASTM D November

Author: Zoloshura Yozshurn
Country: Philippines
Language: English (Spanish)
Genre: Technology
Published (Last): 12 March 2006
Pages: 447
PDF File Size: 9.56 Mb
ePub File Size: 11.92 Mb
ISBN: 697-9-41145-316-8
Downloads: 57097
Price: Free* [*Free Regsitration Required]
Uploader: Shaktizshura

OUR SERVICES

Link to Active This link will always route to the current Active version of the standard. Four case studies conducted in Red Sea state were taken.

Three projects are residential tower buildings representing a part of the residential tower buildings complex of Red Sea state. The initial part of the load-settlement curves Figure 6: Remember me on this computer.

Q The main difference between this system and other dynamic load test systems is the using of an electronic scanning theodolite that records penetration for each blow and records real time elastic displacement [9]. The side of the cap is instrumented with two strain gauges, two accelerometers and electronic theodolite target. The pile design for projects should be optimized by determining the actual ultimate pile capacity, which may need to conduct pile test to failure or near to failure.

This paper has been focused on this type of atm loading test. Skip to main content. This is very clear especially in the results d49450-0 the pile of tower 1 project. D — 00″ 5- Richard T. Referenced Documents purchase separately The documents listed below are referenced within the subject standard but are not provided as part of the standard.

Note A suitable follower may be required for testing cast-in-place concrete piles. The measured force at the pile top is separated into components upward and downward. The load should be applied axially on the pile.

Click here to sign up. The comparisons of load-settlement behaviors for dynamic and static load tests, shown in Figure 5Figure 6 and Figure 7indicate astj the predicted settlement from dynamic and the measured settlement from static are generally consistent to a reasonable extent as reflected by the results of towers 7 and 8.

  ALEXANDER DORIN SREBRENICA PDF

Therefore, it is strongly recommended to optimize the pile design for projects by determining the actual ultimate pile capacity, which may need to conduct pile test to failure or near to failure.

The static pile load test is conducted at low strain and takes longer time than the dynamic pile load test, which is conducted at considerably higher strain [1]. Note High-strain dynamic testing requires a strain at impact which is representative of a force in the pile having the same order of magnitude, or greater, than the ultimate capacity of the pile. Q Figure 3: A pile cap, as an extension to the shaft head with the same diameter as the shaftshould be constructed. All tests were carried out on bored concrete piles.

A schematic d4945-00 of SIMBAT equipment and instrumentation is presented in Figure 2whereas a photograph of a complete set of the equipment is shown in Figure 3. These sensors are connected to an instrument such as a pile driving analyzerthat records, processes and displays data and results [2], [3], [4].

Q Figure 6-a: Essential preparations should be made before the test is carried out in the field. Help Center Find new research papers in: There are two known methods, based on wave propagation theory, for the analysis and interpretation of the dynamic pile load test. Enter the email address you signed up with and we’ll email you a reset link. Q Tower 7 Four case studies of dynamic and static pile d4954-00 tests conducted in the eastern of Sudan have been presented.

This will be achieved by taking four case studies, conducted in Red Sea State in eastern Sudan. In our opinion, it is wise that to determine the actual pile ultimate capacity for a project by testing at least one pile to failure. The length of d9445-00 cap should be at least 1.

Svinkin analyzed a distinctive case history presented by Briaud et al. The static plot is verified by modeling.

  AUTOPIPE EXAMPLES PDF

Dynamic Pile Testing – Quality testing | Dynamic Pile | Modern Construction solutions

Log In Sign Up. The two test results are consistent to a good extent. D945-00 formation at this area is predominantly coralline deposits consisting of completely to slightly weathered coral reef limestone that contains marine shells and fossils.

The modern change, which is considered as one of the significant beneficial changes that have been made to the system since the last Irish survey in is the introduction of theodolite to measure the pile displacement during the impact [6], [7]. This test method is applicable to deep foundation units that function in a manner similar to foundation piles, regardless of their method of installation provided that they are receptive to high strain impact testing.

The dynamic or total reaction, Rdy is d4945-000 for each hammer blow and plotted versus cumulative penetration for the whole set of blows. But generally the settlements predicted by dynamic load test are slightly higher than the settlement measured by the static d4945-000 test.

For mandrel driven piles, the mandrel may be instrumented in a similar way d4945-0 a driven pile provided that the mandrel is constructed of a single member with no joints. Solanki, Associte Professor, and Y.

The cap must be cylindrical, smooth, well-reinforced and of good quality concrete.

ASTM D +dynamic bored pile test | Nguyen Huu Phuoc –

It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.

Q Mhaiskar, S. The pairs of accelerometers and strain transducers are fixed to opposite sides of the tested pile, about at least one shaft diameter below the head, either by drilling and bolting directly to the pile or by welding mounting blocks to ensure a reasonably uniform stress field at the measuring elevation [5], [2]. Load-Settlement Curves for D4495-00 No.

Categories:

Leave a Comment